Pavement Resurfacing Program

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

The Lauderhill Pavement Resurfacing Program maintains City streets through various curb to curb street treatment types, such as grinding and paving and pavement preservation. Street surfaces must be routinely maintained, renewed and resurfaced to extend the service life of the pavement by applying the proper treatment type at different stages of the pavement life.

The Pavement Resurfacing Program is dedicated to keeping the streets safe and in good condition for all users, and to make improvements strategically and efficiently to ensure safer, smoother and longer-lasting streets to support the City’s multi-modal transportation system. A new pavement condition assessment will be undertaken beginning in 2024 to re-prioritize the roadways that need repaving.

Upcoming Projects

The following road resurfacing projects are planned for milling and paving operations. Work will begin with milling, followed by resetting of inlets and manholes and finally, paving and striping. Lane shifts and alternating traffic will be maintained, but short-term closures may be necessary. We recommend travelers select an alternate route. Between milling and paving, there will be rough pavement and raised manholes & inlets. Travelers should slow down and drive with caution through the work zones. All travelers in this area must remain alert to construction equipment and watch carefully for the safety of construction workers.

The schedule below is dependent on good working conditions. Unfortunately, this type of work is susceptible to the weather and unforeseen site conditions. Please check back from time to time as the schedule will be updated periodically to account for these unexpected circumstances, and as the project progresses.

 

pavement

  • 21st Street (from 47th Ave. to SR-7): Summer 2024 – Winter 2025
  • 16th Street (from 47th Ave. to SR-7): Fall 2024 – Fall 2025
  • 19th Street (from 47th Ave. to SR-7): Fall 2024 – Fall 2025
  • 26th Street (from 47th Ave. to SR-7): Fall 2024 – Fall 2025
  • Inverrary Drive: Spring 2025 – Fall 2025
  • Northwest Lauderhill (North of 44th St. and South of 47th St., West of 82nd Ave.): Winter 2025 – Summer 2025

 

Pavement Resurfacing Map